71 – 73 Low Petergate, York

Pinnacle are delighted to have been appointed as Main Contractor on the Grade II* 71-73 Low Petergate, York.

The project will include urgent structural repair works, replacing the decaying second floor timber connections by introducing a new steel bracing system, to ensure that the new sections of timber provide structurally sound connections. Additional steel strengthening will be added to the front of No73.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *